GSOE9820 Project Management WEEK9

1. Managing Risk

Risk: Is the potential of losing something of value, weighed against the potential to gain something of value.

Risk的构成:Cause + Event + Effect

项目管理的精髓就是risk management,包括risk event, consequences, anticipation和contigency plans

risk management process:
-Risk planning and context
-Risk identification
-Risk Assessment
-Risk Response Development
-Risk Response Control

1.1.Risk planning and context

plan includes: objectives, methodology, roles and responsibilities, budgeting, timing, risk categories, scoring interpretation, tolerance thresholds, reporting formats, tracking
context要考虑外在的环境(政策、社会、法律和地理等方面),内在的情况(公司文化,运营状况,公司战略等),以及项目情况。

1.2.Risk identification

识别出所有可能的risk,可以根据个人经验、头脑风暴、Risk breakdown structure等。

1.3.Risk Assessment

通常从三个方面评估风险:
-Probability/Likelihood
-Impact/Severity
-Ease/Difficulty of Detection

1.4.Risk Response Development

识别潜在风险后,应对策略通常有四种:
-Mitigating risk,通过技术或者其他手段降低风险,比如在工地穿安全鞋戴安全帽;
-Avoiding risk,通过改变project plan来避免某些不必要的风险;
-Transferring risk,通过第三方等方式来分摊风险,比如保险;
-Accepting risk,如果必须面对,就妥善做好应对策略。

Types of risks:
-Technical,通常很难应对
-Schedule,做好time padding,有充足的slack
-Cost,做好contigency funding
-Funding

要尽可能将风险转化为一种机会:
to exploit, share, enhance and accept

1.5.Risk Response Control

执行应对策略;监管引发事件;按要求准备应急方案;小心新的风险。

最后编辑于
©著作权归作者所有,转载或内容合作请联系作者
【社区内容提示】社区部分内容疑似由AI辅助生成,浏览时请结合常识与多方信息审慎甄别。
平台声明:文章内容(如有图片或视频亦包括在内)由作者上传并发布,文章内容仅代表作者本人观点,简书系信息发布平台,仅提供信息存储服务。

相关阅读更多精彩内容

  • **2014真题Directions:Read the following text. Choose the be...
    又是夜半惊坐起阅读 13,513评论 0 23
  • 南宁是一座让我去了就不想走的城。 一下车,就能感受到浓浓的南方气息,不只是空气中的湿润,还有路边两排高高的大王椰,...
    笑夏荷阅读 3,047评论 0 1
  • 你想要什么样的生活,你就过上什么样的生活,哦,不,应该说,你就能营造出什么样的生活。只要你把你的社交网站往哪个风格...
    秋裤的小哥阅读 3,798评论 0 0
  • 今天是2016年3月7日,明天就是三八妇女节了,我从心里祝愿普天下的妇女:节日快乐! 今晚,跟侄儿通电话聊了一会,...
    许瑞光阅读 3,161评论 0 0
  • “你慢一点…” 男孩子猛然睁开眼睛,耳边还残留着梦 中女孩子轻柔的声音。他呆愣愣在床上怔了会,翻了个身子,又翻回来...
    秋牙可可阅读 3,262评论 0 2

友情链接更多精彩内容