MR(material requisition)

Last month,the MR of air cooler and column internals are issued .
The MR includes general, equipment and material list, specification and standard, scope of work, scope of supply , technical deviation , vendor's deliverable,quality of management requirement, attached list.

General section describes the summary of project.
Specification and standard section lists the code and standard and the order of precedence .
Scope of work is listed in a table.
Scope of supply is also listed in a table.
Technical requirement defines the requirement for the equipment or material.
The attached document includes the deviation list, the clarification list

©著作权归作者所有,转载或内容合作请联系作者
平台声明:文章内容(如有图片或视频亦包括在内)由作者上传并发布,文章内容仅代表作者本人观点,简书系信息发布平台,仅提供信息存储服务。

推荐阅读更多精彩内容

  • **2014真题Directions:Read the following text. Choose the be...
    又是夜半惊坐起阅读 9,967评论 0 23
  • rljs by sennchi Timeline of History Part One The Cognitiv...
    sennchi阅读 7,453评论 0 10
  • 一、经过108道题测试,选择回答“是”的数量最高如下: 8号:10个,领导型 2号/4号:8个,全爱型和艺术型 3...
    曹门霞客行阅读 2,242评论 14 15
  • 一个人 婚姻是爱情的坟墓,不结婚不是死无葬身之地,而是你可以长生不老了
    桃之芒果阅读 146评论 0 1
  • 从认识到现在已经7年了 中间磕磕绊绊 一度在心灰意冷时 觉得我们之间到此为止了 在难过的时候 会责怪你不懂安慰我 ...
    Miss_Skunk阅读 186评论 0 1