2022-04-13(210)Engineering law and the ICE Contracts

10. “THE ENGINEER’S REPRESENTATIVE OR ANY OTHER PERSON”. It is reasonably clear that under this sub-clause the engineer may delegate his powers to one person only—either the representative or some other person responsible to him. This interpretation is strongly suggested by the contrast between the wording quoted at the head of this note and “any number of persons” in sub-cl. (2)—see p. 45. The context does not require “person” to be interpreted under cl. 1 (2) as including “persons”, because to allow the engineer to divide delegated functions amongst a number of persons, or even to give the same function to two or more concurrently, would produce considerable possibilities for confusion in the control of the works. If “other person” were interpreted to include the plural, logically so should “Engineer” and “Engineer’s Representative”, which interpretation would make the contract unworkable.

It appears that the engineer may himself continue to perform functions which he has delegated, but he is bound by any decision of his delegate unless the contractor refers the decision back to him under sub-cl. (4) or the contractor or employer asks for his decision under cl. 66. The contractor should particularly act under one of those provisions to obtain the engineer’s ruling in a case of conflicting instructions. q

11. “ANY ACT OF ANY SUCH PERSON”. “act”—not omission. For an omission to disapprove work see p. 127, N. 2. May a failure to contradict a confirmation of an oral variation order under cl. 51 be classed as an “act” ?

12. DELEGATION BINDS EMPLOYER “FOR THE PURPOSES OF THE CONTRACT”. This clause is, of course, purely for the contractor’s protection under this contract and binds the employer in relation to the contractor only. The engineer cannot rely on the clause as a defence to liability to the employer for breach of his duty to supervise, if he delegates too freely to a representative (p. 384,N. 26), and the engineer may also be liable outside the contract to third parties for an act of a delegate.

13. NOTICE TO CONTRACTOR OF APPOINTMENT OF SUPERVISORS AND DELEGATION OF FUNCTIONS. The contractor is entitled to receive:

(a) From the engineer, written notice of the name of the person appointed engineer’s representative (cl. 1 (1) (d)).

(b) From the engineer or the engineer’s representative, notice (not specifically required to be in writing or to be prior notice as in (c) below) of the names and functions of the representative’s assistants. This requirement appears to apply to all assistants, even inspectors who are not intended to give any instructions under sub-cl. (2).

(c) Prior written notice of any delegation of the engineer’s functions under sub-cl. (3), specifying either the particular clauses of the contract in respect of which powers are being delegated or that the delegation is generally in respect of all the engineer’s powers under the contract except those not delegable.

(d) Written notification of any change of engineer (cl. 1 (1) (c)) or of the engineer’s representative (cl. 1 (1) (d)) and of change or determination of delegation under sub-cl.(3). Notice of determination of the powers of any assistant of the engineer’s representative is not referred to (nor indeed is any right of determination specified). However, under the general law the contractor will be entitled to rely on the instructions of any such assistant until (but only until) he receives notice of determination of his powers in such a form and from such a source that a prudent contractor would rely on it.

The contractor should be written to with clear-cut notification of the appointment and functions of supervisors as soon as possible after acceptance of tender. Until he receives this notice the contractor should act only on orders from or confirmed by the engineer.

Despite the extreme particularity of this cl. 2, which aims to contribute to the practical administration of the contract by allowing the contractor to determine exactly where he stands in dealing with resident staff, difficulties have been reported in practice due to the engineer’s refusal to follow this clause and to letters of delegation which fail to define delegated powers “specifically in respect of particular Clauses of these Conditions” as required by cl. 2 (3).

These clauses do not differentiate between minor and major variations and instructions, and particularly the absolute restriction on the powers of assistants to the representative (N. 7) may cause delays in practice while minor changes are confirmed.

There may be much to be said for a minuted meeting between the parties at the start of the works to devise a sensible and workable system of delegation of functions, under this clause and cl. 15 (2), and of co-operation between supervisors.

14. ENGINEER’S DECISIONS EXCLUDED FROM DELEGATION. The exclusion of cl. 12 (3) refers to action following notification of unforeseen physical conditions or obstructions, cl. 44 to extension of time, cl. 48 completion certificates, cl. 60 (3) the final certificate, cl. 61 the maintenance certificate, cl. 63 forfeiture, and cl. 66 a decision on referral back to the engineer of a dispute or difference.

Some important functions are not excluded from delegation, e.g. valuation of variations under cl. 52 and interim certificates. The engineer has no power under this clause of his own motion to alter a delegate’s valuation or reverse a decision that work is Engineering law and the I.C.E. contracts 44 an extra. The solution for the engineer is to advise the employer to refer the matter to him for a decision under cl. 66, but pending reversal of the delegate’s decision the employer must pay certificates based on it. For correction of a certificate under cl. 60 (7) refer to p.272.

15. “AUTHORISED BY THE ENGINEER UNDER SUB-CLAUSE (3)” appears to refer to “other person” and not to “act” so that there is a right of appeal to the engineer from acts of the engineer’s representative whether done under sub-cl. (1) in his ordinary supervision of the works, or under sub-cl. (3) in performing delegated powers.

16. APPEAL BY THE CONTRACTOR TO THE ENGINEER FROM A SUPERVISOR’S DECISION. This right of appeal provides a useful alternative to referral back to the engineer under cl. 66. The time for claiming arbitration does not run from the decision under this paragraph and the contractor is left with a right to a further engineer’s decision under cl. 66. The contractor particularly may apply for a review of a decision under this paragraph where he wishes to allow himself a further approach to the engineer when passions have cooled, but not of course if he wishes to go to arbitration as quickly as possible. For the scheme of appeals see N. 1.

17. APPEAL BY EMPLOYER FROM SUPERVISOR’S DECISIONS. The employer’s only way of appeal from a decision (of the engineer, his delegate, the engineer’s representative or his assistants) is to notify the contractor that a dispute exists and refer the dispute to the engineer under cl. 66, and then to arbitration provided he gives notice in time. The engineer should keep the employer advised of his right of appeal, and in particular should notify him of any doubtful decision made by a supervisor. For correction of a certificate refer to p. 272.

18. THE FORMER CLAUSE 2 (a) is moved to cl. 39 (3), and expanded (failure of supervisor to disapprove work or materials does not prejudice power subsequently to do so).

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 216,496评论 6 501
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 92,407评论 3 392
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 162,632评论 0 353
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 58,180评论 1 292
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 67,198评论 6 388
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 51,165评论 1 299
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 40,052评论 3 418
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 38,910评论 0 274
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 45,324评论 1 310
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 37,542评论 2 332
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 39,711评论 1 348
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 35,424评论 5 343
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 41,017评论 3 326
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 31,668评论 0 22
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 32,823评论 1 269
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 47,722评论 2 368
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 44,611评论 2 353

推荐阅读更多精彩内容