2022-03-27(194)Engineering law and the ICE Contracts

The effects of a bulk addition or omission can be settled definitely by adding after it in the bill that it is a lump sum item and to be dealt with in accordance with section 6 of the C.E.S.M.M. It is, of course, open to the employer to exclude the method and to state in the tender documents that any bulk addition or deduction by the contractor will be adjusted for variations alone or both variations and changes in quantities, or for the contractor to tender specifically on the terms that all his rates or the rates in a particular section of the bill are to be taken to have been altered by a percentage as illustrated above. The Department of Transport allows for a “balancing item” in the bill, and alters cl. 56 to specify that the rates and prices in the bill other than those “in respect of any Preliminaries Prime Cost Items (together with their associated items for attendance and profit) and Dayworks” when “used for valuing work in accordance with cls. 52 or 56“are to be adjusted by an appropriate addition or deduction “in proportion that the sum against the balancing item bears to the Tender Total before the addition or deduction of the balancing item and less the above amounts”.

If the contractor makes a deduction in a pure lump sum or quantities contract the original contract work is paid for at the net price shown in the tender. Unless otherwise stated it does not seem that any percentage alterations should be made in the rates for extra work (or increases in quantities) since in this case the mere fact that the contractor makes a deduction for the original contract work does not imply that he is agreeing to a similar deduction for extra work the extent of which he does not know in advance. Where work is omitted, the net price only, after percentage adjustment for the deduction by the contractor, should be subtracted from the lump sum price. Where work is substituted, no percentage adjustment need to be made since adjustments of the omitted work and of the new work (which would only be adjusted up to the value of the omitted work) would cancel themselves out.

Bulk deductions and additions in the bill made initially or after tender to correct mistakes give trouble constantly and create surprises where the quantities of the works change substantially or there are major variations. It is important for both parties to consider the implications of the system for adjustment agreed to, and except where the C.E.S.M.M. adjustment item is adopted without change the intention should be defined in detail by a special term in the contract or endorsement on the bill signed on behalf of both parties, rather than leaving the result to any of the above disputable principles.

7. UNBALANCED BIDS. The comparison by the engineer of the detailed pricing of tenders is a safeguard against an unbalanced bid, where the contractor prices some work high and other work low (e.g. rock and earth in foundations) in the belief that variations or increases in quantities will mean more of the high-priced and less of the low-priced work than estimated in the bill. Obviously such a bid should not be accepted unless it is certain that the contractor’s gamble is wrong, and there may be general doubts as to the integrity of the contractor who makes it. See also pp. 184–9 and 211. Under the I.C.E. 5th edition comparison of rates is the only way of evaluating tenders, since there is no initial contract price, and it is quite misleading to an employer to compare tenders under a remeasurement contract by reference to the tender total (N. 4, p. 12).

For unbalanced method-related charges refer to pp. 219–20.

8. TIME FOR COMPLETION. If no completion time is filled in to the Appendix, unless there is a case for rectification (p. 41 (a)) the contractor has a reasonable time in which to complete the work, and any liquidated damages clause for delay is void since there is no date from which to calculate the damages.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 216,372评论 6 498
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 92,368评论 3 392
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 162,415评论 0 353
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 58,157评论 1 292
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 67,171评论 6 388
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 51,125评论 1 297
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 40,028评论 3 417
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 38,887评论 0 274
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 45,310评论 1 310
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 37,533评论 2 332
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 39,690评论 1 348
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 35,411评论 5 343
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 41,004评论 3 325
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 31,659评论 0 22
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 32,812评论 1 268
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 47,693评论 2 368
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 44,577评论 2 353

推荐阅读更多精彩内容