| Exasmoc Main Controller(Exasmoc主控制器)|
| ------------- |:-------------:| -----:|
| | STANDBY (挂起)| 同上。| |
| | CONTROL (控制)| 同上。 | |
| | OPTIMISE (优化 | 同上。 | |
| | QUEST MODE(查询模式 | 同上。| (自R4.03起可用) 当QuestPro(用于辨识的测试信号发生器)连接到Exasmoc时,显示此图标。|
| Exasmoc MV/CV/POV/DV/EF/CALC视图|
| | ACTIVE(运行)| - 子控制器名称;- “MV”树下的MV位号名;- “CV”树下的CV位号名;- “DV”树下的DV位号名;- “POV”树下的POV位号名;- “EF”树下的EF位号名;- “CALC”树下的CALC位号名; | |
| | INACTIVE(非活动) | 同上。 |
| | BAD| - “MV”树下的MV位号名;- “CV”树下的CV位号名;- “DV”树下的DV位号名;- “POV”树下的POV位号名;- “EF”树下的EF位号名;- “CALC”树下的CALC位号名; | 子控制器不退出。|
| Exasmoc等|
| | 存在面板 | ・GAIN | |
| | 不存在面板| ・MV・CV・DV・POV | 表示文件夹已关闭; 表示文件夹打开。|
| Exarqe预估量|
| | ON | ・Exarqe预估量名称。 | |
| Exarqe预估量|
| | Non-LAB | ・预测概述;・TQE/TQC概述;・预测/参考;・更新/过程动态;・RQE输入;・TQE/TQC;・线性化。|
| | LAB| ・实验室。| |
| | 无面板 | ・预测 | 表示文件夹已关闭;表示文件夹打开。|
| Exaitg|
| | Execution(执行)| ・Exaitg应用名称。 | |
| | Stopped(停止)| 同上。 | |
| | 因错误而停止| 同上。 | |
| | 存在面板 | ・输入数据;・输出数据。| 自R4,01开始。
| Common(通用)|
| | 存在面板 | ・Scheduler(调度)・SmocControl・RqeControl・Message(消息)・Trend(趋势)| 自R4,01开始。|
■执行/停止操作
在浏览栏中右键单击Exasmoc / Exarqe / Exaitg任务时,将弹出显示菜单。 选择Exec/Stop操作。
每个任务都应使用配置构建器预定义。
操作完成后,确认对话框如下所示。若继续,选择“是”,若取消,选择“否”。
表B 3.3 弹出菜单
| 选项| 描述|
| ------------- |:-------------:| -----:|
| 选中组的节点时|
| Exec (执行)| 执行选中组。|
| Stop(停止)| 停止选中的组。当组中包含的任务正在运行时(状态为CONTROL或OPTIMSE),任务无法停止。|
| 当选中Exasmoc任务时|
| Exec(执行)| 执行选中的任务。启动的任务无法超过最大值。且无法启动已经运行的任务或组。|
| Stop(停止)| 停止选中的任务。当任务正在运行时(状态为CONTROL或OPTIMSE),任务无法停止。|
| 当选中Exarqe任务时|
| Exec(执行)| 执行选中的任务。启动的任务无法超过最大值。且无法启动已经运行的任务或组。|
| Stop(停止)| 停止选中的任务。当任务正在运行时(状态为CONTROL或OPTIMSE),任务无法停止。|
| 当选中Exaitg任务时|
| Exec(执行)| 执行选中的任务。启动的任务无法超过最大值。且无法启动已经运行的任务或组。|
| Stop(停止)| 停止选中的任务。当任务正在运行时(状态为CONTROL或OPTIMSE),任务无法停止。|
原文:
|Exasmoc Main Controller|
| ------------- |:-------------:| -----:|
|| STANDBY| Same above ||
|| CONTROL| Same above ||
|| OPTIMISE |Same above ||
|| QUEST MODE| Same above (available from R4.03) |When QuestPro (Test signal generator for identification) is connected to Exasmoc, this Icon is shown.|
|Exasmoc MV/CV/POV/DV/EF/CALC view|
|| ACTIVE| - Sub Controller name- MV tag name under “MV” tree- CV tag name under “CV” tree- DV tag name under “DV” tree- POV tag name under “POV” tree- EF name under “EF” tree- CALC name under “CALC” tree ||
|| INACTIVE| Same above ||
|| BAD| - MV tag name under “MV” tree- CV tag name under “CV” tree- DV tag name under “DV” tree- POV tag name under “POV” tree- EF name under “EF” tree- CALC name under “CALC” tree| Sub Controller does not exit.|
|Exasmoc etc|
|| Panel exists |・GAIN ||
|| Panel does not exist |・MV・CV・DV・POV| shows the folder is closed. shows the folder is open.|
|Exarqe Estimator|
|| ON |・Exarqe Estimator name ||
|Exarqe estimator|
|| Non-LAB |・ Prediction Overview・ TQE/TQC Overview・ Prediction/Reference・ Updating/Process Dynamics・ RQE Inputs・ TQE/TQC・ Linearization ||
|| LAB| ・Lab ||
|| No panel |・Prediction | shows the folder is closed. shows the folder is open.|
|Exaitg|
| |Execution| ・Exaitg application name ||
| |Stopped| Ditto ||
|| Stopped with errors| Ditto||
|| Panel exists |・Input Data・Output Data |A new from R4,01|
|Common|
|| Panel exists| ・Scheduler・SmocControl・RqeControl・Message・Trend| A new from R4,01|
■ Execute/Stop Operation
The pop-up menu is displayed when right-clicking a task of Exasmoc/Exarqe/Exaitg in the browser bar. Select Exec/Stop operation.
Each task should be pre-defined using the configuration builder.
When the operation is done, the confirmation dialog is displayed as below. Select “Yes” when continuing or “No” when cancelled.
Table B 3.3 Popup Menu
|Item Name| Description|
| ------------- |:-------------:| -----:|
|When the Group node is selected|
|Exec | Exec the selected group.|
|Stop| Stop the selected group.When a task included in the group is running (Status is CONTROL or OPTIMSE), the task cannot be stopped.|
|When Exasmoc task is selected|
|Exec| Start the selected task.It is not possible to start more than the maximum number of tasks or start the task or group running.|
|Stop| Stop the selected task.When a task is running (Status is CONTROL or OPTIMSE), the task cannot be stopped.|
|When Exarqe task is selected|
|Exec |Start the selected task.It is not possible to start more than the maximum number of tasks or start the task or group running.|
|Stop| Stop the selected task.When a task is running (Status is CONTROL or OPTIMSE), the task cannot be stopped.|
|When Exaitg task is selected|
|Exec| Start the selected task.It is not possible to start more than maximum number of tasks or to start the task or group running.|
|Stop| Stop the selected task.When a task is running (Status is CONTROL or OPTIMSE), the task cannot be stopped.|
2016.12.3