10天内设计一个可以容纳400多人休息的建筑空间(转)

程华

ThinkParametric 与 Rojkind Arquitecots 联合为 知名品牌 LEONM-PM 的一次特别活动设计一个装置,他们要设计一个可以容纳400多人休息的建筑空间,可以让客户在一个非常有趣的氛围下休息与茶歇等。下文手动搬运,解释了他们如何10天内完成设计概念图与店面施工图。

==========================================================================================================

Designing an installation using computational design tools


In this blog post, we’ll explain how we managed to go from a conceptual design to shop drawings in ten days by relying heavily on to the use of computational design tools throughout the whole design process.

ThinkParametricandRojkind Arquitectoscollaborated on an installation forLENOM-PB, a renowned branding firm, for one of their special events. The design brief consisted of designing an architectural space that would serve as a lounge area to receive over 400 visitors. The area should serve as a space allowing guests to share drinks and relax under and interesting atmosphere.

The project was challenging because of various constraints we had to take into consideration. The main one being a very strict and limited time window to design and build the project. The objective was to come up with a design that complied with the necessities mentioned before and at the same time was able to be manufactured and installed in a simple, fast and efficient way. Another constraint was that the installation needed to be uninstalled easily as the event took place in a television forum where events take place at a regular interval. Finally, the design should create interesting, and elegant spaces for its visitors.


Seating area

The result was the creation of a simple constructive system when put in place correctly generates geometrically interesting spaces. If two elements are connected with wires and those two elements are alternatingly rotated, they create a seemingly vaulted space.

Axonometric diagram

Design intent explanatory diagram

To meet the tight schedules, special computational tools in the form of several scripts were created to automate all the generation of the structural custom nodes this installation required. All the construction drawing sets were automatically generated from the parametric model that was set up for this project. This allowed the design team to jump from a schematic design proposal to a full set of construction drawings in a span of only ten days and gave the fabrication and construction teams enough time to manufacture and install all the elements in time.

To model the nodes in a fast and efficient way, we first modeled a wireframe model consisting of points and lines. The individual line pieces represented the tubes and the points the connection nodes. These points and lines were used as our input in Grasshopper. Within Grasshopper, we had control over the size of the nodes, various spacing requirements between the connections, the size and thickness of the connection plates and the spacing of the tubes depending on the number of elements coming together at a node.

From the 3D wireframe model to shop drawings

Because of the simple geometrical wireframe model, changes could be made fast and because of the use of Grasshopper those changes would automatically update each node, keeping the various requirements and constraints needed for manufacturing. The shop drawings were done manually because of the small number of nodes and also to have an extra check to ensure the nodes were drawn accurate.

The same wireframe model was used to tag each node and element with a unique name. This was done to be able to accurately identify elements during the whole design process from initial design followed by the shop drawings to the manufacturing and installation of the pavilion. The lines were used as an input in Grasshopper to generate the shop drawings of the various tube elements. The most important reason of doing it this way was accuracy. By linking in the line elements, various data was extracted in Grasshopper, like its unique tag, its length, its start and end points and in some cases the number of rings attached to it. The Grasshopper definition generated the shop drawings based on the information extracted from the line elements, eliminating human errors that could have occurred like mislabeling an element or specifying the wrong length.


From the 3D wireframe model to shop drawings

Another important factor is the speed of which these shop drawings were produced. We had a total of 82 tube members, which meant 20 sheets of shop drawings. Because of the Grasshopper definition we could spit out the shop drawings with a press of a button. Some changes occurred during the design process due to extra structural restraints we got from the structural engineer, but luckily we could simply adjust the wireframe model and run the Grasshopper definition again to produce the shop drawings.

Diagram of one of the structural nodes

Image of one of the structural nodes

Simple materials that are widely available and easy to manipulate were selected for the installation. Steel tubes were used for the structural elements and were bolted to custom designed structural nodes. For the wire elements, natural fiber rope was chosen. This material is easy to manipulate and gives a warm feeling to the space, enhancing the effect of creating a ‘roof’ that serves well as a lounge area.


View from the bar area

Conncection detail of the ropes and the tube elements

The installation is comprised of:

– 30 Primary structural members

– 52 Secondary structural Members

– 19 Structural cables

– 38 Custom structural nodes

– 6401 Meter of natural fiber rope


Central area

Wireframe physical model, to help the installers and manufacturer locate, place and fabriacte the elements more easy

Construction detail

Installation process

Central area

Vault detail

If you’re interested in learning more about computational design skills, check out our educational platform at ThinkParametric !

Next Post

Previous Post

Disqus seems to be taking longer than usual. Reload?

最后编辑于
©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 212,542评论 6 493
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 90,596评论 3 385
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 158,021评论 0 348
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 56,682评论 1 284
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 65,792评论 6 386
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 49,985评论 1 291
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 39,107评论 3 410
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 37,845评论 0 268
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 44,299评论 1 303
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 36,612评论 2 327
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 38,747评论 1 341
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 34,441评论 4 333
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 40,072评论 3 317
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 30,828评论 0 21
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 32,069评论 1 267
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 46,545评论 2 362
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 43,658评论 2 350

推荐阅读更多精彩内容

  • **2014真题Directions:Read the following text. Choose the be...
    又是夜半惊坐起阅读 9,437评论 0 23
  • 可是我真的不喜欢金融啊 那就不是真爱 没关系 不合适就是不合适 不用勉强
    学霸小朋友阅读 148评论 0 0
  • 又大又圆的月亮 仿佛触手可及 千百年来 它默默地看着地球上的人类 无悲无喜
    一叶茶阅读 144评论 0 1