2022-04-19(216)Engineering law and the ICE Contracts

2. “IN CASE OF AMBIGUITIES OR DISCREPANCIES…THE ENGINEER SHALL…ISSUE…RIATE INSTRUCTIONS IN WRITING”. The scope of the instructions which the engineer is entitled to issue in resolving an ambiguity or discrepancy in the contract is not altogether clearly expressed in the previous edition of this clause. This amendment gives the engineer the broad power to issue “appropriate instructions”, which are to be regarded as instructions under cl. 13 with a consequential liability to compensate the contractor in some cases.

As a result of this amendment, on resolving an ambiguity or discrepancy the engineer may give instructions not merely as to the “manner (in which) the work is to be carried out” as in the previous edition, but also, e.g., about the time in which the work is to be carried out, or the contents of any documents to be submitted by the contractor.

Nevertheless, two limitations stand from the 4th edition. The engineer may act under this clause only if there is genuinely an ambiguity or discrepancy in the contract; if the contract documents are clear they must usually be applied even if they produce a result which the parties obviously did not intend (N. 1). And the contractor still has no remedy under this clause for ambiguities the resolution of which cannot result in an “instruction”, for example an ambiguity about the method of payment for a claim.

3. EXTRA PAYMENT UNDER CLAUSE 13 FOR AMBIGUITIES AND DISCREPANCIES. The right to extra payment under cl. 13 as incorporated into this clause is less extensive than the contractor’s right to payment under cl. 6 of the previous edition.

Under cl. 13 the contractor is entitled only to compensation to the extent that the “instructions…involve the Contractor in delay or disrupt his arrangements or methods of construction”. The contractor is no longer entitled to extra merely because he has to do more work than he anticipated because of the ambiguity, e.g. where work is shown on one drawing and omitted from another or from the specification, except to the extent that the resolution of the ambiguity causes disruption or delay.

The only exception, specifically stated in this clause, is where the instruction requires a variation to the works. Therefore where the engineer gives an instruction involving work about which the contract documents are ambiguous, it will be necessary under this new wording for the engineer (or arbitrator or court ultimately) to decide as a matter of law the correct interpretation of the documents. If the legally correct interpretation is that the work included in the instruction is part of the original contract works, then the contractor has no remedy under this clause merely because he has been involved in cost “which by reason of any such ambiguity or discrepancy the Contractor did not and had reason not to anticipate” (as he had under the former cl. 6), but only under cl. 13 if there is any delay or disruption involved. If the correct interpretation of the contract is such that the instruction requires the contractor to carry out extra work not part of the original contract works, then the instruction will amount to a variation order with a right to valuation under cl. 52. Since “The several documents forming the Contract are to be taken as mutually explanatory”, work shown e.g., on one drawing but not on another will usually be part of the original contract work and not a variation.

Thus the wording does not achieve what might be thought to be one purpose of a clause of this kind—that irrespective of the correct legal resolution of an ambiguity the contractor should be entitled to extra payment if he was misled by it as to the work to be done.

The engineer has a duty to resolve an ambiguity or discrepancy of his own motion whenever one comes to his attention, irrespective of any request by the contractor for an instruction.

If the contractor does not raise with the engineer an ambiguity or discrepancy of which he but not the engineer has become aware, so that delay or disruption is caused or aggravated, it is suggested that when the matter eventually has to be resolved by an instruction it may not be “reasonable” as required by cl. 13 for the engineer to award the contractor any of the extra cost resulting from the contractor’s default.

The contractor may even have a general duty to notify ambiguities in the contract documents of which he becomes or possibly should become aware, with liability to the employer or third parties for failure to do so. For breach of that duty the contractor may have to bear the costs of remedial works necessary because the ambiguity was not dealt with in time (p. 396).

The incorporation of cl. 13 brings with it cl. 52 (4) about notice of a claim by the contractor for extra payment for an instruction under this clause, and inclusion of payment in interim and final certificates (subject to retention).

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 216,544评论 6 501
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 92,430评论 3 392
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 162,764评论 0 353
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 58,193评论 1 292
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 67,216评论 6 388
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 51,182评论 1 299
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 40,063评论 3 418
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 38,917评论 0 274
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 45,329评论 1 310
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 37,543评论 2 332
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 39,722评论 1 348
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 35,425评论 5 343
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 41,019评论 3 326
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 31,671评论 0 22
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 32,825评论 1 269
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 47,729评论 2 368
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 44,614评论 2 353

推荐阅读更多精彩内容