2022-04-21(218)Engineering law and the ICE Contracts

1. COPIES OF SOME CONTRACT DOCUMENTS TO BE FURNISHED FREE OF CHARGE “UPON ACCEPTANCE OF THE TENDER”. A useful addition to ensure that the contractor has these documents at an early stage. These words hardly bind the engineer to supply the documents on the very day on which the tender is accepted, but in the case of substantial delay, the contractor could have a claim for any adverse effects on his planning (p. 364).

2. DRAWINGS. Definition cl. 1 (1) (g), p. 25.

3. COPIES NOT FURNISHED FREE OF CHARGE. The contractor is not entitled to free copies of the pricing of the bill, the tender, the written acceptance by the employer or of any contract agreement. Copies of the first two should be retained when tendering, the contractor will have the original of the acceptance, and the agreement should be executed in duplicate. There is no requirement in cl. 7 (1) that the contractor is supplied with more than the original of “modified or further drawings and instructions”.

4. COPYRIGHT. See p. 402, N. 35. The statement that copyright shall “remain in the Engineer” is not completely accurate; copyright in the contract documents will belong to the employer where the engineer is a fulltime employee of his, such as an engineer of a local authority.

For ownership of documents see p. 402.

5. “THE CONTRACTOR MAY…MAKE…ANY FURTHER COPIES REQUIRED BY HIM”. Clearly, this permission is limited to copies required for the works, since the engineer owns the copyright—see the last note.

6. RETURN OF DOCUMENTS BY THE CONTRACTOR. The contractor is not required to return the bill of quantities.

Only “Drawings” and “Specifications” each with a capital letter have to be “returned” under this sub-clause, i.e. those furnished or approved in writing by the engineer within the definition in cl. 1 (1) (f) and (g), and not other drawings, etc., made by the contractor, e.g. for his own temporary works.

The documents are to be returned “At the completion of the Contract”. That stage appears to be reached only with the issue of the final certificate under cl. 60(3) and not earlier with the maintenance certificate, particularly as the contractor may need the documents for preparing his final account.

7. “THE ENGINEER…SHALL SUPPLY…SUCH MODIFIED OR FURTHER DRAWINGS” ETC. See N. 11.

8. “NECESSARY FOR THE PURPOSE OF THE PROPER AND ADEQUATE CONSTRUCTION COMPLETION AND MAINTENANCE OF THE WORKS”—“REQUIRE FOR THE EXECUTION OF THE WORKS OR OTHERWISE UNDER THE CONTRACT”. No reason for this variety of wording is apparent.

9. “THE CONTRACTOR SHALL GIVE ADEQUATE NOTICE IN WRITING” of drawings, etc., required. See N. 11.

10. CLAIMS FOR “FAILURE OR INABILITY OF THE ENGINEER TO ISSUE AT A TIME REASONABLE IN ALL THE CIRCUMSTANCES DRAWINGS OR INSTRUCTIONS”. In view of the importance of disruption claims by contractors, this phrase is discussed separately in ch. 12 on disruption.

11. “DRAWINGS OR INSTRUCTIONS REQUESTED BY THE CONTRACTOR”. This clause can hardly be said to be graced with a rational scheme. Sub-cl. (1) places the duty on the engineer to issue “modified or further drawings” as he considers necessary; nevertheless, the contractor is required by sub-cl. (2) to give “adequate notice in writing” of any “further drawing or specification” that he may require for the execution of the works. and by sub-cl. (3) is entitled to compensation only for delay in the issue of “drawings or instructions requested” and “considered necessary by the Engineer in accordance with sub-clause (1)”.

In view of the ambiguity of the requirement that drawings and instructions must be “requested” to entitle the contractor to claim for delay (not, as could easily have been said if intended, “requested by notice in accordance with sub-clause (2)”), the initial duty placed on the engineer to supply drawings, etc., and the incidental mystery of the change from “drawings and instructions” in sub-cl. (1) to “drawing or specification” in sub-cl. (2) and back again to “drawings or instructions” in sub-cl. (3), it does not seem that “requested” means requested by the contractor by “adequate notice in writing” as specified in sub-cl. (2). Nor does it seem that the contractor is limited to claiming for a period of delay after a request has been made (“at a time” not “within a time”).

Nevertheless, lateness of or lack of clarity or urgency in a request may be relevant to deciding what was a reasonable time for the engineer to provide the drawings or instructions (p. 365). hh

There remains also the very practical point that the contractor has a remedy under this clause for late drawings or instructions only if they have been “requested” by him at some time before receipt. This clause appears to be intended as a comprehensive provision dealing with the contractor’s remedy for delayed instructions or drawings (unlike the equivalent provision of the J.C.T. Standard Forms of building contract, in which the contractor’s common law rights are specifically preserved), so that there is no room for implication of any other term dealing with compensation for delay with drawings or instructions which have not been requested (p. 42). However, in certain circumstances the contractor’s rights under other clauses may come to his rescue. ii 

The problems of delay and disruption claims are discussed at large in ch. 12, but the relationship of the various clauses in these Conditions can be summarised by saying that in so far as performing the work in instructions or drawings would have caused the delay whenever they were issued, then the contractor may have a remedy under cls. 13 or 51 but not under this clause (N. 15); in so far as the contractor suffers delay before instructions or drawings are issued in waiting for them, his only remedy for the cost of that delay is under this clause; if because of the time at which the instructions are issued the contractor has to delay the works after their issue (e.g. in order to pre-plan) he may have the useful alternative to a claim under this clause of claiming under cl. 13 or cl. 51, for instance if the engineer produces some delaying detail which the contractor did not expect and therefore did not request in advance as required by this clause.

In the interests of progress of the works as well as his contractual position if matters do go wrong, it is advisable for the contractor to have a regular office procedure by which in sending his programme he also notifies the dates by which he requires the full drawings and instructions for specified parts of the works. A programme under cl. 14 merely showing a date on which particular work is to be carried out is hardly by itself a sufficient implied request for the drawings and instructions necessary to execute that work so as to satisfy the requirements of this clause.

The contractor should also have a set procedure for giving further written notice in good time of all information he needs, allowing a reasonable period for the engineer to prepare and issue the information and for the contractor himself to do any necessary pre-planning, and recording in what cases and why delay in furnishing the information will disrupt his work. The importance of such records for both the engineer and the contractor is discussed again under the heading of “Claimsmanship” in ch. 17.

Only the engineer or his delegate specifically given all the engineer’s functions or his functions under this clause appear to have power to receive the necessary request, not the engineer’s representative or his assistants (cl. 2 (1)–(3)).

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 215,463评论 6 497
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 91,868评论 3 391
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 161,213评论 0 351
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 57,666评论 1 290
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 66,759评论 6 388
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 50,725评论 1 294
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 39,716评论 3 415
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 38,484评论 0 270
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 44,928评论 1 307
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 37,233评论 2 331
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 39,393评论 1 345
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 35,073评论 5 340
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 40,718评论 3 324
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 31,308评论 0 21
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 32,538评论 1 268
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 47,338评论 2 368
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 44,260评论 2 352

推荐阅读更多精彩内容